Excellence in Every Detail

Services That Make a Meaningful Difference
for Your Business

Pre-Production Inspection (PPI)

PPI takes place before start of bulk production, PPI can assure the client about raw materials verifications and status. After PPI, client is sure that supplier has right/adequate raw material for quality product.

In-Line Inspection & Process (ILI&P)

Once the goods arrive in stitching department, we send our Q.A. for random in-line Inspections. He goes to the factory and does a random in-line inspection and makes a report of his findings.

During Production Inspection (DUPRO)

DUPRO takes place when approximately 32 to 50% production is completed re insuring that initial discrepancies have been rectified and a check on the average quality of production runs.

CAP (Corrective Action Plan)

A document used in quality management that outlines a set of steps for addressing issues and gaps in business operations that could negatively impact the business.

Fabric Inspection and Process (FIP)

Buyer may require 100% inspection of all greige fabric rolls and production dye lots. The purpose of inspection is to determine the quality and acceptability of materials.

Final Random Inspection (FRI)

FRI is to evaluate the problems against 100% finished and ready to export goods. FRI is a very useful standard Quality Assurance check prior to shipment.
Inspections Completed
0 +
Happy Clients
0 +
Years Experience
0 +
Client Satisfaction
0 %
QUALITY ASSURANCE

NCR (Non Compliance Report)

FABRIVANTA non-conforming product is bad for both FABRIVANTA as well as the vendors because if a Customer receives a defective product it hurts the buyer's brand image. Non-Compliance Reports (NCR) are directly integrated into all quality issues found by the buyer's team in the head office. An NCR is a step-by-step process of determining a problem's root cause, implementing the appropriate corrective action, and preventing recurrence.
PROBLEM SOLVING

The Eight Steps of the 8D Methodology

TESTING & STANDARDS

Lab Testing & Quality Standards

Magnetic stirrer

Lab Testing

We have affiliation with a most professional 3rd party lab which provides lab testing services as per our client requirements.

Test checklist

Quality Standards

MIL-STD-105E (ANSI/ASQC Z1.4, BS6001, DIN40080 AND ISO 2859), 4-Point system and AQL 2.5/4.0.

COMPLIANCE

Customer Compliance Audits

Quality Is Our Passion, Quality Is Our Business